Yes, most structural changes, additions, or major repairs require a building
permit. Check with your local building authority.
Timelines vary based on the project’s size, weather, permit processing, and
contractor availability. A full house build may take 6–12 months.
Renovation restores existing structures, while remodeling changes the design or
layout entirely.
Look for licensed, insured contractors with references and a solid portfolio.
Get multiple quotes and written contracts.
Building codes are regulations that ensure safety, structural integrity, and
energy efficiency. Failing to follow them can result in fines or unsafe
conditions.
Chemical waterproofing is the process of applying chemical-based products (like
coatings, membranes, or sealants) to surfaces such as roofs, basements, walls,
and concrete structures to prevent water infiltration.
It can be applied to a variety of areas including:
Roofs and terraces
Basements
Bathrooms and toilets
Water tanks
Swimming pools
Balconies
External walls
Selection depends on:
Area of application (e.g., roof, basement)
Surface condition
Exposure to sunlight or water pressure
Budget